NURail CoE Projects

Project IDProject ManagerPrincipal InvestigatorUniversityDepartmentProject TitleCompletion Status
KSU-I1Eric FitzsimmonsRobert PetermanKansas State UniversityCivil EngineeringDevelopment of a Hybrid Concrete Tie for Increased Rotational Capacity and Resilience
KSU-I2Eric FitzsimmonsChristopher JonesKansas State UniversityCivil EngineeringCrosstie Flexural ComparisonProject is greater than 75% complete.
MTU-I1Pasi LautalaQuang Tran & Paul SandersMichigan Technological UniversityMaterials Science and EngineeringEnhancing Accuracy of Ultrasound Imaging in Detecting Surface Cracks in Metal Using MicrobubblesProject is completed.
MTU-I2Pasi LautalaYousef DarestaniMichigan Technological UniversityCivil, Environmental, and Geospatial EngineeringLife-Cycle Cost Assessment of Coastal Rail InfrastructureProject is completed.
MTU-I3Pasi LautalaSai Sandeep ChittaMichigan Technological UniversityCivil, Environmental, and Geospatial Engineering
Micromechanics of Fresh and Fouled Railway Ballast
Project is greater than 75% complete.
MTU-I4Pasi LautalaYi ZhuMichigan Technological UniversityCivil, Environmental, Geospatial EngineeringModular Kirigami Truss for Temporary Railroad Bridge Systems Project is greater than 75% complete.
MTU-I5Pasi LautalaRichard DobsonMichigan Technological UniversityMichigan Tech Research InstituteIntegrating Long-Distance Drone Operations into Rail Inspections
Project is greater than 25% complete.
MTU-I6Pasi LautalaVijaya V N Sriram Malladi & Qinglin DaiMichigan Technological UniversityMechanical and Aerospace EngineeringPhysics-Informed Digital Twin for Nondestructive Rail Stress Monitoring Using Scanned Vibration WavefieldsProject is less than 25% complete.
MTU-I7Pasi LautalaYousef DarestaniMichigan Technological UniversityCivil, Environmental, and Geospatial EngineeringDevelopment of Data-driven Fragility Models for Rail Track Components Subjected to Storm Surge and WaveProject is greater than 25% complete.
MTU-I8Pasi LautalaQuang TranMichigan Technological UniversityCivil, Environmental, and Geospatial EngineeringEnhancing Accuracy of Ultrasound Imaging in Detecting Surface Cluster Cracks in Metal Using Contrast-enhanced UltrasoundProject is less than 25% complete.
MTU-I9Pasi LautalaZhanping YouMichigan Technological UniversityCivil, Environmental, and Geospatial EngineeringIncorporating Recycled Asphalt and Tire Rubber into the Underlayment Layer for Railroad Ballast to Improve Track PerformanceProject is less than 25% complete.
MTU-S1Pasi LautalaElizabeth S. VeinottMichigan Technological UniversityPsychology and Human FactorsImproving Rail Safety: Effect of highway rail-grade crossing type (short storage) and cognitive load on driver decisionsProject is greater than 50% complete.
MTU-SC1Pasi LautalaKuilin ZhangMichigan Technological UniversityCivil, Environmental, and Geospatial EngineeringTemporal Fusion Transformer-Based Grade Crossing Signal Timing Prediction Using Train Trajectory DataProject is less than 25% complete.
MTU-SC2Pasi LautalaDon Lafreniere & James JuipMichigan Technological UniversitySocial SciencesFramework and Case Studies for Improved Estimating and Modeling Intercity Train Passenger RidershipProject is less than 25% complete.
RU-SC1Xiang LiuXiang LiuRutgers UniversityCivil and Environmental EngineeringData Integration and Informatics for Track Asset ManagementProject is greater than 75% complete.
TU-S1Heshmat AglanHeshmat AglanTuskegee UniversityMechanical EngineeringFracture and Fatigue Damage Tolerance of Arc Welded Railhead and Thermite Weld RepairsProject is greater than 50% complete.
TU-S2Heshmat AglanHeshmat AglanTuskegee UniversityMechanical EngineeringDevelopment and Characterization of Railhead Repairs using Shielded Metal Arc WeldingProject is less than 25% complete.
UD-S1Allan ZarembskiAllan ZarembskiUniversity of DelawareCivil, Construction and Environmental EngineeringRisk Based Track Surfacing ModelProject is greater than 75% complete.
UD-S2Allan ZarembskiJoseph PaleseUniversity of DelawareCivil, Construction and Environmental EngineeringRisk Based Walking Inspection Frequency ModelProject is greater than 75% complete.
UD-S3Allan ZarembskiAllan ZarembskiUniversity of DelawareCivil, Construction and Environmental EngineeringExtension of Risk-Based Track Geometry Inspection Interval ModelProject is less than 25% complete.
UD-S4Allan ZarembskiJoseph PaleseUniversity of DelawareCivil, Construction and Environmental EngineeringExtension of Risk-Based Walking Inspection Scheduling Framework: Probabilistic Deterioration Modeling and Multi-Modal Inspection IntegrationProject is less than 25% complete.
UIC-SC1P.S. SrirajKazuya KawamuraUniversity of Illinois ChicagoDepartment of Urban Planning and PolicyRail Economic Impact Analysis Linking Local BusinessesProject is greater than 50% complete.
UIC-SC2P.S. SrirajJane LinUniversity of Illinois ChicagoCivil, Materials and Environmental EngineeringAI-Enabled Autonomous Drayage–Rail Coordination for Efficient Intermodal LogisticsProject is less than 25% complete.
UIC-SC3P.S. SrirajKouros MohammadianUniversity of Illinois ChicagoCivil, Materials and Environmental EngineeringA Data-Driven Framework for Prioritizing and Optimizing Rail Service Investments Using IPDI
Project is less than 25% complete.
UIC-SC4P.S. SrirajKouros MohammadianUniversity of Illinois ChicagoCivil, Materials and Environmental EngineeringRail as a Supply-Chain Stabilizer: Mapping Shock Propagation and Redundancy Gaps in U.S. Freight Rail
Project is less than 25% complete.
UIC-SC5P.S. SrirajP.S. SrirajUniversity of Illinois ChicagoDepartment of Urban Planning and PolicyAnalysis of Variations in Service Quality and its Determinants across Commuter Rail MarketsProject is greater than 25% complete.
UIC-SC6P.S. SrirajP.S. SrirajUniversity of Illinois ChicagoDepartment of Urban Planning and PolicyFinancial Resilience for Rail in the Age of AI: Reducing Electricity Costs and Enhancing Corridor Revenue
Project is greater than 25% complete.
UIUC-I1Riley EdwardsRiley EdwardsUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringBuckle Risk Modeling Leveraging Track Geometry and Condition Data
Project is greater than 75% complete.
UIUC-I10Riley EdwardsJohn PopovicsUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringAssessment of Impulse Response to Characterize Rail Lateral Stiffness
in the Field
Project is less than 25% complete.
UIUC-I11Riley EdwardsHadi MeidaniUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringExplainable Spatiotemporal Machine Learning for Multicomponent Railway Track Degradation ModelingProject is less than 25% complete.
UIUC-I2Riley EdwardsRamez HajjUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringCombined Grade Crossing Track/Highway Multiphysics ModelProject is greater than 75% complete.
UIUC-I3Riley EdwardsJohn PopovicsUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringQuantifying Lateral Track Capacity Using Nondestructive Nonlinear Vibration ResponseProject is greater than 75% complete.
UIUC-I4Riley EdwardsErol TutumluerUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringField Ballast Condition Evaluation Using Machine Vision and Artificial IntelligenceProject is greater than 75% complete.
UIUC-I5Riley EdwardsRiley EdwardsUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringComparative Evaluation of Capital and Spot Tamping Effectiveness through Track Geometry Deterioration Rates
Project is completed.
UIUC-I6Riley EdwardsMarcus DerschUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringRail Anchor Slip Strength: Effect of Anchor Wear, Rail Wear, Load Rate, and Reaction PositionProject is completed.
UIUC-I7Riley EdwardsMarcus DerschUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringUAV-Based Measurements with Optimization-Based Geometric CorrectionProject is completed.
UIUC-I8Riley EdwardsMarcus DerschUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringAdvancement of 3D Dynamic Finite Element Model FrameworkProject is completed.
UIUC-I9Riley EdwardsAnn SychterzUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringPhase 2: Modular Tunable Kirigami Truss for Temporary Railroad Bridge SystemsProject is less than 25% complete.
UIUC-S1Chris BarkanChris BarkanUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringEfficacy of 4-Quad Grade Crossing Gates Compared to Other Warning Systems
Project is greater than 75% complete.
UIUC-S2Chris BarkanChris BarkanUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringAdvanced Simulation Modeling of Tank Car Safety Performance in DerailmentsProject is greater than 50% complete.
UIUC-S3Chris BarkanYuanchen ZengUniversity of Illinois Urbana-ChampaignCivil and Environmental EngineeringDetectability-driven Design of An Easy-to-Deploy Wayside Hunting Detection SystemProject is less than 25% complete.
UIUC-SC1Chris BarkanKirill LevchenkoUniversity of Illinois Urbana-ChampaignElectrical and Computer EngineeringPositive Train Control with Asymmetric Authentication and Key ManagementProject is greater than 75% complete.
UT-I1C. Tyler DickYunlan (Emma) ZhangUniversity of Texas at AustinCivil, Architectural and Environmental EngineeringStrengthening the Railway Track Lateral Resistance by Reinforcing Ballast with Architected Instability-based Metamaterials (AIMs)Project is greater than 50% complete.
UT-I2C. Tyler DickYunlan (Emma) ZhangUniversity of Texas at AustinCivil, Architectural and Environmental EngineeringStrengthening the Railway Track Lateral Resistance by Reinforcing Ballast with Architected Instability-based Metamaterials (AIMs)Project is greater than 25% complete.
UT-S1C. Tyler DickSalvatore SalamoneUniversity of Texas at AustinCivil, Architectural and Environmental EngineeringRail Defect Detection System Based on Non-contact Vibration MeasurementsProject is greater than 75% complete.
UT-S2C. Tyler DickC. Tyler DickUniversity of Texas at AustinCivil, Architectural and Environmental EngineeringAnalysis of Trends in the Location and Circumstances of Freight Train Handling DerailmentsProject is less than 25% complete.
UT-S3C. Tyler DickSalvatore SalamoneUniversity of Texas at AustinCivil, Architectural and Environmental EngineeringRail Defect Detection System Based on Non-contact Vibration MeasurementsProject is less than 25% complete.
UT-SC1C. Tyler DickC. Tyler DickUniversity of Texas at AustinCivil, Architectural and Environmental EngineeringOptimizing Efficiency and Cost of Innovative Strategies for Freight Rail Motive Power Energy SupplyProject is greater than 75% complete.
UT-SC2C. Tyler DickC. Tyler DickUniversity of Texas at AustinCivil, Architectural and Environmental EngineeringComparing Freight Rail Propulsion Strategies for Efficient and Economical US Mainline OperationsProject is greater than 75% complete.
UT-SC3C. Tyler DickC. Tyler DickUniversity of Texas at AustinCivil, Architectural and Environmental EngineeringModeling the Reliability of Shared Corridors Under Contemporary Operating PracticesProject is less than 25% complete.
National University Rail Center of Excellence
1239B Newmark Civil Engineering Laboratory, MC-250
205 N Mathews Avenue
Urbana, IL 61801
(217) 300-1340